EQUIPMENT
Furnace
Last documented Aug 4, 2026Run Tru · 80,000 BTU · 80% · single stage
Furnace: Run Tru single-stage 80,000 BTU 80% gas furnace, installed Mar 13, 2026 with a mechanical permit, together with the new AC. The city asked on Jul 17, 2026 for the flue screw holes to be filled and passed it on Aug 4, 2026. It replaced the furnace the Feb 25, 2026 home inspection put at 40-50 years old. Warranty: 10 year parts, 1 year labor, 20 year heat exchanger.
- MADE
- Not stated on these documents
- DOCUMENTED
- 3 times
- Mar 2026 to Aug 2026
- LAST DOCUMENTED
- Aug 4, 2026
- City occupancy inspection: passed
HISTORY OF THIS UNIT
- Inspection
City occupancy inspection: passed
Passed overall. Furnace, gas shut-off and flue: 2nd Pass, on the flue item the Jul 17 inspection failed.
View the record: City occupancy inspection: passed, Aug 4, 2026 - Inspection
City occupancy inspection: furnace flue to fix
Failed overall. Furnace, gas shut-off and flue: fail, fill in the screw holes at the furnace flue with screws.
View the record: City occupancy inspection: furnace flue to fix, Jul 17, 2026 - Install
Installed as part of a complete system
Installed a new Run Tru single stage 80,000 BTU 80% furnace and a Run Tru 2.5 ton 13 SEER air conditioner with a matching cased insulated evaporator coil, with a mechanical permit. The invoice lists taking the old furnace apart to get it out of the basement and hauling away the existing HVAC equipment. Part of a $6,775 job.
View the record: Installed as part of a complete system, Mar 13, 2026
BEFORE THIS UNIT
Furnace · Estimated 40-50 years old
Documented Feb 25, 2026 by Greensmith Home Inspection llc. Replaced Mar 13, 2026.
View the previous unit: Furnace
UNIT DETAILS
- Made
- Not stated on these documents
- Installed
- Mar 13, 2026Service date on the installer's invoice: source record for Installed
- Size
- 80,000 BTU, 80% efficiency, single stageWritten on the installer's invoice: source record for Size
- Model
- Not stated on these documents
- Serial
- Not stated on these documents
- Permit
- Mechanical permit on the invoice, number not givenLine item on the installer's invoice: source record for Permit
- Warranty
- 10 year parts, 1 year labor, 20 year heat exchangerEquipment warranty on the installer's invoice: source record for Warranty
- Cost
- Part of a $6,775 complete system job (job total after a $1,200 sale; it also covers the thermostat and the permit)Job total on the installer's invoice: source record for Cost
CONTRIBUTING PROFESSIONAL
- Arch Air Services1 record
Every entry links to the record it came from.