Property records for 3322 North Hanley Road, St. Louis, MO 63121
All 3 public upload records returned by the Fresh House property feed are available across 1 server-rendered page. This page shows records 1 to 3.
Record details are source-backed where available. Permit status and descriptions repeat the publishing agency's data; they do not independently establish that work was completed.
On May 1, 2024, ASSURED HEATING AND COOLING documented HVAC at 3322 North Hanley Road, St. Louis, MO 63121.
Record date
Documented details
Outcome: Paid in full
Available findings
HVACCompleted work$99
A/C tune up performed.
Record 2·Public property record
HVAC Tune-Up Service — A/C tune up
HVAC
On May 20, 2025, ASSURED HEATING AND COOLING documented HVAC at 3322 North Hanley Road, St. Louis, MO 63121.
Record date
Documented details
Outcome: Paid in full
Available findings
HVACCompleted work$188
Performed an A/C tune up, with a master lock/key supplied and half an hour of labor.
HVACWork status not resolved
R-410A TXV system subcooling test shows current subcooling of 16° against a recommended 13°; system status is Correct Charge.
HVACWork status not resolved
AWA
HVACWork status not resolved
Record 3·Public property record
HVAC Work — Drain tube, clamps and fitting supplied
HVAC
On June 20, 2025, ASSURED HEATING AND COOLING documented HVAC at 3322 North Hanley Road, St. Louis, MO 63121.
Record date
Documented details
Outcome: Paid in full
Available findings
HVACCompleted work$135
Labor performed and materials supplied: 3/4" drain tube, 1/2" clamps (qty 2), and a 1/2" male to male drain fitting.
HVACWork status not resolved
Photograph shows a large flexible metal sewer snake cable running from equipment in the upper right down to a concrete basement floor, with dark wet debris and residue scattered on the floor near the cable end.
HVACWork status not resolved
Photograph shows a concrete basement/garage floor with a wet trail of moisture and debris running diagonally across the surface, a clear flexible hose laid along the same path, and a white painted structural column with a concrete footing base on the right side.